---
title: "Business Calendar panel changelog for Grafana"
description: "Displays events in a sleek calendar view, pulling from diverse data sources for seamless integration. See install steps and the changelog."
---

> This is the Markdown version of https://grafana.com/grafana/plugins/marcusolsson-calendar-panel/changelog/

# Business Calendar - Change log

# Changelog

All notable changes to the **Business Calendar Panel** plugin for Grafana are documented in this file.

This changelog follows the [Keep a Changelog](https://keepachangelog.com/en/1.0.0/) format and adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0.html).

## \[4.2.4] - 2026-05-21

### Changed

- Debounce the `Calendar` remount key on panel resize to avoid full tree rebuilds on every pixel change during a drag.
- Remove `textSize` from the `Calendar` remount key; font size changes propagate via CSS without a remount.
- Memoize `firstDay` in `useCalendarEvents` to avoid redundant locale lookups on every render.
- Cache `Intl.DateTimeFormat` instances per timezone in `getMinutesOffsetFromTimeZone` to avoid re-allocating the formatter on every call; use `formatToParts` to eliminate locale-dependent string parsing entirely.
- Merge double `.map()` in `useCalendarEvents` into a single pass to halve intermediate array allocations per frame on every data refresh.
- Move `minutesOffset` computation inside `useCalendarEvents` outer `useMemo` so the timezone offset refreshes on every dashboard time range change, fixing stale offsets after DST transitions.
- Replace `dayjs` year extraction in `filterEventsByYear` with `Date.getFullYear()` to avoid constructing dayjs objects per event in year view.
- Memoize agenda view length (`daysInMonth`) in `BigCalendar` on the current date.
- Updated `@grafana/create-plugin` scaffolding from 7.0.8 to 7.6.0 (fixes TypeScript 6 `baseUrl`/`bundler` compat).
- Externalized `react/jsx-runtime` and `react/jsx-dev-runtime` for React 19 compatibility.
- Removed deprecated `@types/testing-library__jest-dom` dev dependency.

### CI/CD

- Bumped `actions/create-github-app-token` v3.0.0 → v3.2.0.
- Replaced `stamp-changelog` publish job with `check-changelog`: fails if `CHANGELOG.md` contains an `[Unreleased]` section, requiring a version matching `package.json` before release.
- Bumped `davelosert/vitest-coverage-report-action` v2.11.2 → v2.12.0.

### Known Issues

- `react-big-calendar` bundles `react-overlays` which uses `ReactDOM.findDOMNode` (removed in React 19). The code path is only reached for class component instances and is unlikely to be hit in practice, but a permanent fix requires an upstream release of `react-overlays` > 5.2.1.

### Project Updates

- Added `.npmrc` with `ignore-scripts=true` to disable lifecycle scripts and mitigate supply-chain attack risk.
- Upgraded `@grafana/plugin-e2e` from 3.6.1 to 3.8.0; `addPanel` flow now works on Grafana 13 but `setVisualization` still fails due to a selector mismatch in `@grafana/e2e-selectors` 13.0.1. Test remains skipped on Grafana 13+ pending an upstream fix.
- Updated patch/minor dependencies: `@swc/core` 1.15.33, `@types/node` 24.12.4, `sass-loader` 16.0.8, `@grafana/tsconfig` 2.1.0, `@playwright/test` 1.60.0.
- Bumped Playwright Docker base image from `v1.59.1-noble` to `v1.60.0-noble`.

## \[4.2.4] - 2026-04-29

### Changed

- Updated minimum Grafana version to 12.3.0 for React 19 support.

### Project Updates

- Updated development tooling dependencies.
- Refactored internal hooks for React 19 compatibility.
- Improved E2E test coverage and stability on Grafana 13+.
- Improved CI workflows: coverage reporting, PR file summaries, and automated changelog stamping on release.
- Removed `pr-files.yml` workflow; GitHub's native Files changed tab supersedes it.

## \[4.2.3] - 2026-04-23

### Changed

- Bumped Node version requirement to 24.
- Updated plugin build tooling (`.config/` from `@grafana/create-plugin` v7.0.8).
- Added missing webpack dependencies (`imports-loader`, `webpack-subresource-integrity`, `webpack-virtual-modules`).
- Updated dependencies within semver ranges (Grafana 12.4.2, webpack 5.105.4, i18next 25.10.10, sass 1.98.0, etc.).
- Removed unused dependencies (`@stylistic/eslint-plugin`, `tsconfig-paths`).
- Simplified `docker-compose.yaml` to extend base config.
- Pinned CI/CD workflows to `ci-cd-workflows/v7` instead of `@main`.
- Pinned Playwright Docker image to `v1.59.1-noble`.
- Bumped minimum supported Grafana version to 12.0.0.
- Upgraded `@grafana/plugin-e2e` from 2.x to 3.4.10 for Grafana 12.4.2 E2E compatibility.
- Skipped React 19 preview image in Playwright E2E tests (pending upstream `react-overlays` fix).
- Inlined `useDashboardVariables` hook and removed `@volkovlabs/components` dependency.
- Removed unused `grafana-dev` Docker Compose service.
- Updated patch/minor dependencies (`@grafana/plugin-e2e` 3.4.11, `@playwright/test` 1.59.1, `@swc/core` 1.15.24, `@swc/helpers` 0.5.21, `sass` 1.99.0).
- Optimized Playwright config: increased workers (4 local, 2 CI), reduced retries (0 local, 2 CI).
- Optimized Playwright Dockerfile with dependency layer caching.

### Fixed

- Added `pull-requests: read` permission to `publish.yml` so the reusable `cd.yml@ci-cd-workflows/v7` workflow can run.
- Fixed ESLint flat config compatibility with `eslint-plugin-react-hooks@7` legacy plugins format.
- Added `aria-label` to icon-only toolbar buttons for `@grafana/ui` 12.4.2 compatibility.
- Replaced deprecated `classicColors` with `theme.visualization.palette`.
- Typed `Drawer` mock props to fix `no-explicit-any` lint warning.
- Replaced `volkovlabs.io` URLs with Grafana equivalents.
- Fixed stale `functionsRef` in inlined `useDashboardVariables` hook.
- Fixed reverted `useRuntimeVariables` import to use local `useDashboardVariables` hook.

### Added

- Added `cspell.config.json` for spell checking with missing words.
- Added `AGENTS.md` with build/test commands, code style guidelines, naming conventions, testing conventions, ESLint rules, changelog policy, and branching policy.

## \[4.2.0] - 2025-10-23

### Project Updates

- Grafana Labs fork.

## \[4.1.0] - 2025-08-19

### Changed

- Updated ESLint configuration ([#269](https://github.com/VolkovLabs/business-calendar/pull/269)).
- Updated dashboard reload for data links ([#271](https://github.com/VolkovLabs/business-calendar/pull/271)).

## \[4.0.1] - 2025-06-23

### Changed

- Revert react-big-calendar version ([#268](https://github.com/VolkovLabs/business-calendar/pull/268)).

## \[4.0.0] - 2025-06-04

### Breaking Changes

- Now requires Grafana 10 or 11.

### Changed

- Updated Multi-Day Events ([#264](https://github.com/VolkovLabs/business-calendar/pull/264)).
- Upgraded to Grafana 12.0.1 and updated dependencies ([#265](https://github.com/VolkovLabs/business-calendar/pull/265)).
- Fix panel crashes on switching color scheme to single color([#266](https://github.com/VolkovLabs/business-calendar/pull/266)).

## \[3.9.1] - 2025-03-18

### Added

- Updated "There are no events in this range" message in the alert info component ([#258](https://github.com/VolkovLabs/business-calendar/pull/258)).
- Adjusted Yearly view layout to prevent shifting with smaller panel sizes ([#257](https://github.com/VolkovLabs/business-calendar/pull/257)).
- Enabled Yearly view to display events from previous years ([#260](https://github.com/VolkovLabs/business-calendar/pull/260)).

## \[3.9.0] - 2025-02-20

### Added

- Updated end-to-end (E2E) tests ([#250](https://github.com/VolkovLabs/business-calendar/pull/250)).
- Upgraded to Grafana 11.5 and updated dependencies ([#252](https://github.com/VolkovLabs/business-calendar/pull/252)).
- Enhanced release workflow to include attestation ([#252](https://github.com/VolkovLabs/business-calendar/pull/252)).

## \[3.8.0] - 2024-10-25

### Added

- Added multi-day event support in Yearly view ([#243](https://github.com/VolkovLabs/business-calendar/pull/243)).
- Updated migration process for threshold color filters ([#248](https://github.com/VolkovLabs/business-calendar/pull/248)).
- Improved `useRuntimeVariables` hook for Scenes dashboards ([#247](https://github.com/VolkovLabs/business-calendar/pull/247)).
- Upgraded to Grafana 11.3 and updated dependencies ([#248](https://github.com/VolkovLabs/business-calendar/pull/248)).

## \[3.7.0] - 2024-09-15

### Added

- Enhanced Yearly view to display events ([#240](https://github.com/VolkovLabs/business-calendar/pull/240)).
- Upgraded to Grafana 11.2 and updated dependencies ([#241](https://github.com/VolkovLabs/business-calendar/pull/241)).

## \[3.6.0] - 2024-08-19

### Added

- Modified tooltip to prevent drawer opening when selecting text ([#235](https://github.com/VolkovLabs/business-calendar/pull/235)).
- Updated date-time format to support multiple languages ([#236](https://github.com/VolkovLabs/business-calendar/pull/236)).
- Hid event detail actions when no actions are available ([#238](https://github.com/VolkovLabs/business-calendar/pull/238)).

## \[3.5.0] - 2024-07-25

### Added

- Added event details in tooltip on hover ([#217](https://github.com/VolkovLabs/business-calendar/pull/217), [#221](https://github.com/VolkovLabs/business-calendar/pull/221)).
- Introduced option to disable event time display ([#223](https://github.com/VolkovLabs/business-calendar/pull/223)).
- Updated daily calendar view to reflect time range changes ([#229](https://github.com/VolkovLabs/business-calendar/pull/229)).
- Reordered description fields for consistency ([#230](https://github.com/VolkovLabs/business-calendar/pull/230)).
- Adjusted date handling to use time zone option ([#227](https://github.com/VolkovLabs/business-calendar/pull/227)).

## \[3.4.0] - 2024-07-16

### Added

- Improved E2E workflow using Docker ([#211](https://github.com/VolkovLabs/business-calendar/pull/211)).
- Added font size configuration option ([#213](https://github.com/VolkovLabs/business-calendar/pull/213)).
- Upgraded to Grafana 11.1 and updated dependencies ([#214](https://github.com/VolkovLabs/business-calendar/pull/214)).

## \[3.3.0] - 2024-06-19

### Added

- Enhanced variables with static datasource for time range in source dashboard ([#205](https://github.com/VolkovLabs/business-calendar/pull/205)).
- Added support for multiple description fields ([#206](https://github.com/VolkovLabs/business-calendar/pull/206)).
- Introduced threshold-based color options ([#208](https://github.com/VolkovLabs/business-calendar/pull/208)).
- Added Portuguese language support in Grafana 11 ([#209](https://github.com/VolkovLabs/business-calendar/pull/209)).

## \[3.2.0] - 2024-06-11

### Added

- Updated tutorial video ([#190](https://github.com/VolkovLabs/business-calendar/pull/190)).
- Added formatting options for event descriptions ([#182](https://github.com/VolkovLabs/business-calendar/pull/182)).
- Improved details drawer layout ([#192](https://github.com/VolkovLabs/business-calendar/pull/192)).
- Added support for additional time range sources ([#179](https://github.com/VolkovLabs/business-calendar/pull/179)).
- Enhanced event format ([#188](https://github.com/VolkovLabs/business-calendar/pull/188)).
- Updated time range in Agenda view ([#196](https://github.com/VolkovLabs/business-calendar/pull/196)).
- Improved mouse cursor behavior in Agenda view ([#200](https://github.com/VolkovLabs/business-calendar/pull/200)).
- Updated dependencies ([#200](https://github.com/VolkovLabs/business-calendar/pull/200)).
- Added display of dashboard annotations ([#194](https://github.com/VolkovLabs/business-calendar/pull/194)).
- Introduced Portuguese language support ([#201](https://github.com/VolkovLabs/business-calendar/pull/201)).
- Localized toolbar and messages to the selected language ([#203](https://github.com/VolkovLabs/business-calendar/pull/203)).

## \[3.1.0] - 2024-05-19

### Added

- Added Agenda (List) view ([#177](https://github.com/VolkovLabs/business-calendar/pull/177)).
- Enhanced customization for event bubbles ([#178](https://github.com/VolkovLabs/business-calendar/pull/178)).
- Improved multi-day window handling ([#183](https://github.com/VolkovLabs/business-calendar/pull/183)).
- Upgraded to Grafana 11 ([#184](https://github.com/VolkovLabs/business-calendar/pull/184)).

## \[3.0.0] - 2024-05-02

### Breaking Changes

- Renamed plugin to "Business Calendar Panel".
- Replaced Legacy Calendar with Big Calendar.
- Now requires Grafana 10 or 11.

### Added

- Preserved dashboard refresh on time range changes ([#167](https://github.com/VolkovLabs/business-calendar/pull/167)).
- Added plugin E2E tests and removed Cypress ([#168](https://github.com/VolkovLabs/business-calendar/pull/168), [#170](https://github.com/VolkovLabs/business-calendar/pull/170)).
- Replaced Legacy Calendar with Big Calendar ([#172](https://github.com/VolkovLabs/business-calendar/pull/172)).
- Prepared compatibility for Grafana 11 ([#175](https://github.com/VolkovLabs/business-calendar/pull/175), [#176](https://github.com/VolkovLabs/business-calendar/pull/176)).

## \[2.5.0] - 2024-03-20

### Added

- Updated styling for event detail tags ([#161](https://github.com/VolkovLabs/business-calendar/pull/161)).
- Upgraded dependencies to Grafana 10.4 ([#154](https://github.com/VolkovLabs/business-calendar/pull/154)).

### Fixed

- Fixed display of location in Month and Work Week views ([#160](https://github.com/VolkovLabs/business-calendar/pull/160)).

## \[2.4.0] - 2024-03-07

### Added

- Upgraded Big Calendar to version 1.10.3 ([#150](https://github.com/VolkovLabs/business-calendar/pull/150)).
- Added option to select date format ([#151](https://github.com/VolkovLabs/business-calendar/pull/151)).
- Updated ESLint configuration and refactored code ([#152](https://github.com/VolkovLabs/business-calendar/pull/152)).
- Updated dependencies and GitHub Actions ([#154](https://github.com/VolkovLabs/business-calendar/pull/154)).
- Added option to hide end time ([#155](https://github.com/VolkovLabs/business-calendar/pull/155)).

### Fixed

- Fixed retention of calendar dates when time range is unchanged ([#156](https://github.com/VolkovLabs/business-calendar/pull/156)).

## \[2.3.1] - 2023-11-06

### Fixed

- Corrected import order for default Big Calendar styles and overrides ([#143](https://github.com/VolkovLabs/business-calendar/pull/143)).

## \[2.3.0] - 2023-11-01

### Added

- Added Yearly view ([#134](https://github.com/VolkovLabs/business-calendar/pull/134)).
- Introduced internationalization (Spanish, French, German, Chinese) ([#135](https://github.com/VolkovLabs/business-calendar/pull/135), [#138](https://github.com/VolkovLabs/business-calendar/pull/138)).
- Added default view selection option ([#137](https://github.com/VolkovLabs/business-calendar/pull/137)).
- Enabled "scroll to time" feature in Big Calendar ([#140](https://github.com/VolkovLabs/business-calendar/pull/140), [#141](https://github.com/VolkovLabs/business-calendar/pull/141)).

## \[2.2.0] - 2023-10-06

### Added

- Added event location support in Big Calendar ([#127](https://github.com/VolkovLabs/business-calendar/pull/127)).
- Improved contrast for event text colors ([#129](https://github.com/VolkovLabs/business-calendar/pull/129)).
- Upgraded to Grafana 10.1.4 and Plugin Tools 2.0.2 ([#132](https://github.com/VolkovLabs/business-calendar/pull/132)).
- Updated Grafana Access Policy for plugin signing ([#132](https://github.com/VolkovLabs/business-calendar/pull/132)).
- Added dashboard timezone support for start and end times ([#128](https://github.com/VolkovLabs/business-calendar/pull/128)).
- Added view selection options: Day, Week, Work Week, and Month ([#133](https://github.com/VolkovLabs/business-calendar/pull/133)).

## \[2.1.0] - 2023-08-14

### Added

- Added annotation type and limit options ([#121](https://github.com/VolkovLabs/business-calendar/pull/121)).
- Upgraded to Grafana 10.0.3 ([#122](https://github.com/VolkovLabs/business-calendar/pull/122)).
- Added language messages for Big Calendar ([#123](https://github.com/VolkovLabs/business-calendar/pull/123)).

## \[2.0.1] - 2023-08-03

### Fixed

- Fixed display of annotation options ([#119](https://github.com/VolkovLabs/business-calendar/pull/119)).

## \[2.0.0] - 2023-07-28

### Breaking Changes

- Now requires Grafana 9.2 or 10.

### Added

- Increased test coverage ([#105](https://github.com/VolkovLabs/business-calendar/pull/105)).
- Introduced Big Calendar component for rendering ([#106](https://github.com/VolkovLabs/business-calendar/pull/106)).
- Updated ESLint configuration ([#106](https://github.com/VolkovLabs/business-calendar/pull/106)).
- Removed support for Grafana 8.5 ([#110](https://github.com/VolkovLabs/business-calendar/pull/110)).
- Upgraded to Grafana 10.0 ([#110](https://github.com/VolkovLabs/business-calendar/pull/110)).
- Improved event overlap handling when start and end dates are equal in Big Calendar ([#112](https://github.com/VolkovLabs/business-calendar/pull/112)).
- Added quick links in Big Calendar ([#113](https://github.com/VolkovLabs/business-calendar/pull/113)).
- Updated back/next buttons for Weekly and Daily views in Big Calendar ([#114](https://github.com/VolkovLabs/business-calendar/pull/114)).
- Enhanced button styles in Big Calendar ([#115](https://github.com/VolkovLabs/business-calendar/pull/115)).
- Improved calendar resizing in Big Calendar ([#116](https://github.com/VolkovLabs/business-calendar/pull/116)).

## \[1.4.0] - 2023-06-10

### Added

- Upgraded to Grafana 9.5.2 ([#96](https://github.com/VolkovLabs/business-calendar/pull/96), [#101](https://github.com/VolkovLabs/business-calendar/pull/101)).
- Added text formatting, mappings, and overrides ([#97](https://github.com/VolkovLabs/business-calendar/pull/97)).
- Removed unused standard options ([#97](https://github.com/VolkovLabs/business-calendar/pull/97)).
- Increased test coverage and updated testing library ([#100](https://github.com/VolkovLabs/business-calendar/pull/100), [#103](https://github.com/VolkovLabs/business-calendar/pull/103)).
- Migrated to Plugin Tools 1.5.2 ([#101](https://github.com/VolkovLabs/business-calendar/pull/101)).
- Upgraded to Node 18 ([#101](https://github.com/VolkovLabs/business-calendar/pull/101)).
- Added E2E Cypress testing ([#102](https://github.com/VolkovLabs/business-calendar/pull/102)).

### Fixed

- Increased event spacing to prevent overflow ([#96](https://github.com/VolkovLabs/business-calendar/pull/96)).

## \[1.3.0] - 2023-03-08

### Added

- Upgraded to Grafana 9.4.3 ([#87](https://github.com/VolkovLabs/business-calendar/pull/87)).
- Added label splitting for display in drawer ([#88](https://github.com/VolkovLabs/business-calendar/pull/88)).
- Added annotation tags as labels ([#88](https://github.com/VolkovLabs/business-calendar/pull/88)).
- Improved multi-day interval handling ([#89](https://github.com/VolkovLabs/business-calendar/pull/89)).
- Enabled color display based on event or frame ID if color field is unspecified ([#90](https://github.com/VolkovLabs/business-calendar/pull/90)).
- Added support for color schemes ([#91](https://github.com/VolkovLabs/business-calendar/pull/91)).
- Added video configuration tutorial ([#92](https://github.com/VolkovLabs/business-calendar/pull/92)).

### Fixed

- Fixed scrollable content in Day drawer ([#93](https://github.com/VolkovLabs/business-calendar/pull/93)).

## \[1.2.0] - 2023-02-23

### Breaking Changes

- Refactoring and styles migration may introduce breaking changes. Test before upgrading in production.

### Added

- Added color selection for calendar entry queries ([#67](https://github.com/VolkovLabs/business-calendar/pull/67)).
- Filtered out undefined events ([#69](https://github.com/VolkovLabs/business-calendar/pull/69)).
- Updated CI and release workflows ([#72](https://github.com/VolkovLabs/business-calendar/pull/72)).
- Rebuilt using Grafana 9.3.6 ([#73](https://github.com/VolkovLabs/business-calendar/pull/73)).
- Refactored options editors to use field pickers ([#74](https://github.com/VolkovLabs/business-calendar/pull/74)).
- Refactored Day and Events drawer ([#75](https://github.com/VolkovLabs/business-calendar/pull/75)).
- Removed panel padding ([#75](https://github.com/VolkovLabs/business-calendar/pull/75)).
- Updated Day view and styles ([#76](https://github.com/VolkovLabs/business-calendar/pull/76)).
- Migrated to Styles v2 ([#79](https://github.com/VolkovLabs/business-calendar/pull/79)).
- Aligned week start with Grafana settings ([#80](https://github.com/VolkovLabs/business-calendar/pull/80)).
- Skipped undefined events in drawer ([#81](https://github.com/VolkovLabs/business-calendar/pull/81)).
- Added display time option ([#82](https://github.com/VolkovLabs/business-calendar/pull/82)).
- Updated styles and screenshot ([#83](https://github.com/VolkovLabs/business-calendar/pull/83)).

## \[1.1.0] - 2022-12-12

### Breaking Changes

- Refactoring may introduce breaking changes. Test before upgrading in production.

### Added

- Updated panel options in README ([#53](https://github.com/VolkovLabs/business-calendar/pull/53)).
- Added YouTube tutorial for Calendar with JSON API datasource ([#54](https://github.com/VolkovLabs/business-calendar/pull/54)).
- Updated CI to Node 16 and synced with release workflow ([#56](https://github.com/VolkovLabs/business-calendar/pull/56)).
- Upgraded to Grafana 9.2.2 ([#57](https://github.com/VolkovLabs/business-calendar/pull/57)).
- Refactored code ([#58](https://github.com/VolkovLabs/business-calendar/pull/58)).
- Upgraded to Grafana 9.3.1 ([#59](https://github.com/VolkovLabs/business-calendar/pull/59)).
- Updated CI to upload signed artifacts ([#60](https://github.com/VolkovLabs/business-calendar/pull/60)).
- Refactored panel options and increased test coverage ([#61](https://github.com/VolkovLabs/business-calendar/pull/61)).
- Added annotation support ([#8](https://github.com/VolkovLabs/business-calendar/pull/8)).
- Removed legacy code ([#62](https://github.com/VolkovLabs/business-calendar/pull/62)).
- Enhanced panel options with annotations ([#63](https://github.com/VolkovLabs/business-calendar/pull/63)).

## \[1.0.0] - 2022-10-02

### Added

- Transferred maintenance to Volkov Labs ([#51](https://github.com/VolkovLabs/business-calendar/pull/51)).
- Updated based on Volkov Labs Panel Template ([#51](https://github.com/VolkovLabs/business-calendar/pull/51)).
- Upgraded to Grafana 9.1.6 ([#52](https://github.com/VolkovLabs/business-calendar/pull/52)).

## \[0.7.1] - 2022-08-28

### Added

- Upgraded to Grafana 9.

## \[0.7.0] - 2022-03-09

### Added

- Added quick links to follow data links on event click instead of opening a modal.
- Upgraded to Grafana 8.4.3.

## \[0.6.0] - 2022-01-28

### Breaking Changes

- Increased minimum Grafana requirement to 8.0 due to new theming engine.

  - Use v0.5.0 for Grafana versions below 8.0.
  - Upgrade to v0.6.0 for Grafana 8.0 or higher.

## \[0.5.0] - 2021-09-06

### Added

- Added data links support ([#25](https://github.com/VolkovLabs/business-calendar/pull/25)).
- Introduced inline drawer for event details, replacing tooltips ([#25](https://github.com/VolkovLabs/business-calendar/pull/25)).
  - Note: Feedback welcome on the new design; considering a custom sidebar alternative.

## \[0.4.3] - 2021-06-12

### Added

- Renamed "Apply time interval" to "Apply time range" to align with Grafana.
- Increased contrast for single-day events.

## \[0.4.2] - 2021-05-22

### Fixed

- Fixed issue where `classicColors` was still undefined ([#16](https://github.com/VolkovLabs/business-calendar/pull/16)).

## \[0.4.1] - 2021-05-21

### Fixed

- Fixed `classicColors` undefined error ([#16](https://github.com/VolkovLabs/business-calendar/pull/16)).
- Improved legibility of event text ([#15](https://github.com/VolkovLabs/business-calendar/pull/15)).

## \[0.4.0] - 2021-05-20

### Added

- Displayed event names for events starting outside the filtered day ([#13](https://github.com/VolkovLabs/business-calendar/pull/13)).
- Added support for more calendars and colors ([#14](https://github.com/VolkovLabs/business-calendar/pull/14)).
- Enabled line breaks in event descriptions ([#11](https://github.com/VolkovLabs/business-calendar/pull/11)).

## \[0.3.0] - 2021-05-18

### Added

- Added detailed view for individual events ([#10](https://github.com/VolkovLabs/business-calendar/pull/10)).

## \[0.2.0] - 2021-05-09

### Added

- Added multi-day event support ([#1](https://github.com/VolkovLabs/business-calendar/pull/1)).
- Enabled display of truncated events ([#6](https://github.com/VolkovLabs/business-calendar/pull/6)).
- Supported string and number fields for time dimensions.

## \[0.1.1] - 2021-02-10

- No changes.

## \[0.1.0] - 2021-02-10

### Added

- Initial release (not production-ready).
